CL Construction provided all labor and materials to construct a new 160' by 300' grain pile system to hold approx. 730,000 bushels of yellow corn. CL crews formed, rebar, and poured a 160' x 310' oval concrete foundation for the grain buncker with a 2% slop from center to outside. Provided and assembled new 10' high LeMar bunker walls included with OSHA approved walkways and guard railing. Provided and installed all new 24" aeriation to meet min. 1/7 CFM aeration. Provided and assembled new 25,000 BPH LeMar transport belt conveyor.